                      JUNE 2007  | 
            |||||||||||||
| 
                 | 
            |||||||||||||
| 
                 
                  The pool re-pipe project continues.  Almost complete with the un-do phase.  It is difficult to see in this photo, but the black line heading to the right is some direct burial electrical cable - I never found the other end.  Still a few more roots to remove from the area where the new concrete pad for the pump will be located.
                 
               | 
            |||||||||||||
| 
                 
                  
                    And now for something completely different.  Bonnie and I went to Texas to visit Tara at her new house.
                   
               | 
            |||||||||||||
| 
                 | 
            |||||||||||||
| 
                 | 
            |||||||||||||
| 
                 And the view from the back, where she has access to her garage from an alley. Of course, houses need maintenance, and there was a Dad-do list waiting. And lots of gardening for Bonnie to work on.  | 
            |||||||||||||
| 
                 | 
              |||||||||||||
| 
                 | 
            |||||||||||||
| 
                 | 
            |||||||||||||
| 
                 
                  Then it was back home to actually begin the reconstruction phase of the pool project.
                 
               | 
              |||||||||||||
| 
                 